Finish Kit April 2011 Updates
April 02, 2011 Baffle Material Install and New Flap Controller.... - 3.0 hrs
April 03, 2011 ShowPlanes Flap Position Controller.... - 4.0 hrs
April 07, 2011 ShowPlanes Flap Position Controller & Top Skin.... - 1.0 hrs
April 14, 2011 ShowPlanes Flap Position Controller back from Repair.... - 2.0 hrs
April 17, 2011 Final Checks for Engine Start.... - 6.0 hrs
April 21, 2011 Hangar Asphalt Sealer ..... - 0.0 hrs
April 23, 2011 Engine Start Party.... - 2.0 hrs
April 30, 2011 Oil Leak Fix and Transponder Check.... - 6.0 hrs

This website was built to document my work in compliance with the FAA requirements needed to certify my aircraft.
My experiences and comments are by no means to be considered as instructions on how to build any aircraft.